CASE STUDIES
A closer look at some of the facades we have delivered: the scope, the challenge and how our own team got it done.

01
Client: Maple Facades
Scope: Eurobond panels, louvres, fins, perforated panels, flashings and coping.
Challenge
Restricted site access and tight logistics.
Solution
The right lifting equipment and planned delivery points for the MERLO.
Outcome
Delivered safely, on programme, with a high-quality finish.



02
Client: Sage BEC
Scope: BTS rainscreen cladding, re-clad project.
Challenge
Getting all the old materials safely down the scaffold and off site, without leaving anything behind.
Solution
Planning each day around what can physically be stripped and removed from the scaffold, working as one team with the other trades and booking enough time on the hoist.
Outcome
Now finishing the last elevation with a brand-new BTS rainscreen system, within programme.





03
Main contractor: Vieo
Scope: Standing seam cold roof and walls.
Challenge
We took over from a contractor who had not delivered on time.
Solution
Teamwork and planning ahead.
Outcome
400m² of roof in 2 weeks and 270m² of walls in under 7 days as a start.



04
Client: Lancer Scott
Scope: Re-clad project.
Challenge
Several contractors had gone bust before us, and the subcontractors who started the job weren't up to the task or the quality.
Solution
However difficult it got, our team stayed on task and helped the client make decisions. Every week we planned the work, constantly checked materials so we were never short, and worked with the scaffold crew on when they could strike.
Outcome
Delivered, built a strong relationship with the main contractor and were awarded new projects.





05
Client: Sage BEC
Scope: NBK baguettes and rainscreen cladding.
Challenge
A city-centre site with very little space for materials. Every week we had to plan what could fit on site and, more importantly, what we could install to clear space for the next week's deliveries.
Solution
We ran the job like a military operation. A brand-new product, a quirky design and many different corners meant recording every detail so each area passed inspection and we could move on.
Outcome
Delivered to a perfect standard without issues: a state-of-the-art building in a brand-new product that matches the surrounding architecture.



06
Client: Sage BEC
Scope: CORTEN rainscreen and Eurobond panels.
Challenge
Heavy panels that had to be lifted by forklift and hooked onto pre-made rails, and CORTEN needs weathering to build up its patina.
Solution
With the scaffold crew we built A-frames to lay out the new panels, and sprayed them twice a day with salt water to build the patina before they were installed.
Outcome
Our first project built properly, nearly 7 years ago, and it still looks outstanding today.





07
Main contractor: Central Cladding Systems
Scope: Timber cladding on SPIDI MAX FixFast bracket and rail, Rockwool insulation and Siderise fire barriers.
Challenge
800m² of rainscreen in a short window.
Solution
Working around the weather and cutting timber to size on site.
Outcome
Delivered within programme, as promised.